The assembly of the MC-21-300 fuselage to be tested with the Russian PD-14 engine was completed

The assembly of the MC-21-300 fuselage was completed at the Irkutsk Aviation Plant, a branch of Irkut Corporation (part of UAC). This aircraft will be tested with the Russian PD-14 engine. The semi-bodies of the prototype were docked at the automated station.  Installation of systems, joining of wing consoles and tail fins of the MC-21-300 aircraft will begin soon.

 

Video of the MC-21-300 fuselage docking:

 

Source - UAC

Our partners